| Rosell
Surveying & Mapping, Inc. has been in operation in the Southern
California area for the past 12 years. We run three full time field
crews with the ability to expand to 5 crews when necessary. Our
party chiefs are experienced in construction staking, boundary and
topography. We have three CAD operators who are proficient in AutoCAD
and Microstation. Our CAD operators are experienced in preparing
tentative maps, final maps, legal descriptions, ALTA's, boundary,
topography, and giving support to our field crews.
Rosell Surveying
& Mapping, Inc. continues to do work for such companies as Metropolitan
Water District, Watson Land Company, Centex Homes, Lennar Homes,
Southern California Gas Company, Environmental Geotechnical Laboratories
(EGL), Plotnik & Associates, and Spec Services, one of the top
engineering firms in Southern California. Some of the larger projects
we have completed include:
250 Acre Construction Staking Project at Dominguez Technological
Center West (DTC West). mass grading, curb & gutter, underground,
etc....
- 50 Acre Construction
Staking project for Dominguez Technological Center East (DTC East).
Mass grading, curb & gutter, underground and building layout.
- Numerous
condominiums, single family and concrete tilt-up projects throughout
the Los Angeles Basin. Includes preliminary boundary and topography,
record maps, construction staking.
- Rancho Summit
1 - 130 Aerial topography in Rancho Cucamonga.
- Rancho Summit
II - 200 Acre Boundary & Topography in Rancho Cucamonga
- Blue Mountain
- 230 Acre Boundary & Topography in Rancho Cucamonga.
- City of Whittier
- Control for Aerial Mapping the City of Whittier, CA using GPS
- Fast Static Methods.
- Pipeline
staking, as-builts and pipeline locations using conventional and
GPS procedures throughout Southern California, includes locating
120 miles of Questar Southern Trails Pipeline.
- 13 miles
of pipeline staking and as-builts for the Southern California
Gas Company, line 6900, includes legal description and plat preparation
for right of way acquisitions.
- Alameda Corridor
- Right of Way Survey and Topography on BNSF railroad property.
- GPS control
staking on a 17 mile 24 inch gas pipeline project in Fontana,
CA.
- Staking,
as-built, and freeway monitoring for a 8 inch hydrogen pipeline
project in Carson, CA.
- 36 inch directional
drill near pier A at the Long Beach Harbor using GPS for control.
- 640 acre
survey of strip mine in Kern County, CA.
- 240 acre
ALTA survey in Kern County, CA.
- We also prepare
the preliminary mapping, as-builts, legal descriptions, and 1A
letters for cellular phone antenna sites (Cell Sites), combining
both GPS and conventional methods.
- 490 acre
boundary and topographic survey for a single family subdivision
at Coyote Canyon in Fontana, CA
- Establish
Geodetic Coordinates for 2500 parking stalls at 11 Los Angeles
County Metro Authority Bus terminal sites, including establishing
control for the GPS receiver and radio. Contracted to Orbital
Sciences Corp.
|
“We're
very happy with the work (data provided and responsiveness) that you
did -- the combination of the parking space surveys and the precise
locating of the DGPS reference site are allowing us to meet our technical
objective of accurately locating the parking location of buses based
on using our GPS data. We will certainly keep you in mind for future
work.” --
F. Joseph Harvatine Orbital
Sciences Corporation |
“Hi,
Dave! I am sitting here, going through the PTRs, a happy little camper,
looking also at your meticulous surveys. What a way to spend a Friday.
It is such a pleasure to be able to look at such a professional survey.
Really. As I've told you, I've worked with many different surveyors,
some good, some not so. I put you on the top of my list of the great
ones.” --Lois
S. LeBar Loeb
& Loeb LLP |